Articles Recently Tagged: Transbay Block 8

(17 posts)
Proposed Waterfront Tower Rendered With Five New Towers As Well

Proposed Waterfront Tower Rendered With Five New Towers As Well

Earlier this week we revealed the new design for the proposed 20-story residential tower to rise at 75 Howard Street, with 133 market rate condos over 6,000 square feet of restaurant/retail space and a basement “vault” for 100 cars. Today, a plugged-in tipster delivers the first rendering for the project... Read More »

Developer Cuts 99 Units From Transbay Tower Citing Market Demand

Developer Cuts 99 Units From Transbay Tower Citing Market Demand

Related California’s winning bid to build a 56-story tower designed by architect Rem Koolhaas and the Office for Metropolitan Architecture (OMA) at the corner of Folsom and First, along with a Fougeron Architecture designed mid-rise along Folsom and Fremont, included a total of 653 residences, of which 177 were to... Read More »

Whole Foods Dropped From Transbay Development Plans

Whole Foods Dropped From Transbay Development Plans

In addition to cutting 99 residential units from their development plans for Transbay Block 8, Related California has reduced the project’s proposed grocery store space from 22,000 to 12,500 square feet, which means that Whole Foods is out and the developer is now seeking a “comparable” type of grocery... Read More »

Another Million Budgeted For Delayed Folsom Street Off-Ramp Project

Another Million Budgeted For Delayed Folsom Street Off-Ramp Project

Having already increased the budget for the realignment of the Folsom Street off-ramp from $2,883,900 to $3,479,541, the City is now slated to add another $1.2 million, for a total project cost of $4,679,541 and counting, 62 percent over the project’s original budget. As we first reported last month,... Read More »

Folsom Street Off-Ramp Work Delayed By Contaminated Soil

Folsom Street Off-Ramp Work Delayed By Contaminated Soil

Originally expected to be finished this month, the realignment of the Folsom Street off-ramp is now expected to run into June and the budget for the project has been increased 21 percent, from $2,883,900 to $3,479,541. The delay and cost overruns are primarily due to the discovery of higher... Read More »

Plans For The Transbay District’s First Full-Service Grocery Store

Plans For The Transbay District’s First Full-Service Grocery Store

It’s true.  The 31,500 square feet of retail to be built at the base of the Transbay Block 8 development includes 22,000 square feet of underground space for a full-service grocery store at the corner of Folsom and Fremont. And Whole Foods has indeed expressed their interest in being... Read More »

Timing And Details For Starchitect Designed Transbay District Tower

Timing And Details For Starchitect Designed Transbay District Tower

Related California is planning to start construction on the 56-story tower designed by Architect Rem Koolhaas and the Office for Metropolitan Architecture (OMA) to rise at the corner of Folsom and First, along with the Fougeron Architecture designed podium and mid-rise along Folsom and Fremont, in Spring of 2016.... Read More »

San Francisco’s Transbay District Rising And Urban Living Room

San Francisco’s Transbay District Rising And Urban Living Room

Believe it or not, that’s a slice of San Francisco’s not too distant future skyline rendered above, a view from the elevated Transbay Park, looking south towards the 550-foot tower of Transbay Block 8 (which is in the works) and the 400-foot tower of Transbay Block 9 (which is already rising).... Read More »

Rem Koolhaas Design Selected For Folsom Street Tower

Rem Koolhaas Design Selected For Folsom Street Tower

With a winning bid of $72 Million for San Francisco’s Transbay Block 8, the City’s Office of Community Investment and Infrastructure has selected Related California to develop a 550-foot residential tower, podium, and low-rise project along Folsom Street. As a plugged-in reader correctly reported last week, Millennium Partners losing... Read More »

Three Teams And A Starchitect Bidding To Develop Transbay Block 8

Three Teams And A Starchitect Bidding To Develop Transbay Block 8

Three teams have responded to the city’s request for proposals to develop San Francisco’s Transbay Block 8, the one-acre parcel fronting Folsom Street between First and Fremont. The three developers bidding are Millennium Partners (think Millennium Tower), Related California (think the Paramount at 680 Mission), and Golub (think 299... Read More »